Out of stock online
FAB Defense TAR Podium Quick Deployment Bipod for TAR 21 Rifle, Black - FX-TARPODB
Out of stock online
FAB Defense TAR Podium Quick Deployment Bipod for TAR 21 Rifle, Black - FX-TARPODB
| SKU | 165451222 |
|---|---|
| Brand | FAB Defense |
| MPN | FX-TARPODB |
| UPC | 7290105943941 |
CA WARNING (Prop 65) & Compliance Information
Please read before purchasing.
Please read before purchasing.
Product Details
Details
- Brand: FAB Defense
- Model: TAR Podium
- Fits: TAR 21 Rifles
- Weight: 5.64 oz.
- Width: 2.28" (5.35" Deployed)
- Height: 1.38" (3.3" Deployed)
- Length: 4.88"
- Material: Reinforced Polymer
- Color: Black
Features
The TAR Podium by FAB Defense is a specialty made bipod platform for the TAR 21 rifle. FAB Defense's TAR Podium is designed by Tamir Porat, the designer of the Tavor TAR 21. This steady, durable bipod platform is constructed from lightweight, high quality reinforced polymer and designed to be compact with no protruding parts. The TAR Podium replaces the grip bottom cap and is secured with a single screw, making installation quick and easy, with no need for a gunsmith. The TAR Podium offers a rapid deployment mechanism with a push of a button, as well as saving rail space for other mounted accessories.
Compatibility:
- TAR 21 rifles including CTAR 21 / GTAR 21 and STAR 21 (not compatible with the X95)
Reviews
Q & A
Retail Stock
Compliance
Shipping Restrictions
It is the customer’s responsibility for understanding state laws regarding all purchases made. For a comprehensive list of all Shipping Restrictions, please refer to our Shipping Restrictions By State Page found Here.
All NFA Rules Apply
These items are controlled by the U.S. Government and authorized for export only to the country of ultimate destination for use by the ultimate consignee or end-user(s) herein identified. They may not be resold, transferred, or otherwise disposed of, to any other country or to any person other than the authorized ultimate consignee or end-user(s), either in their original form or after being incorporated into other items, without first obtaining approval from the U.S. government or as otherwise authorized by U.S. law and regulations.